Inside the Rise20 build

You can see what sits behind the finished walls.

These original photographs document the first Rise20 build—from its steel chassis and light-gauge steel framing through sheathing, systems, insulation, exterior-envelope work, and interior close-in.

Rise20 steel structure receiving exterior structural sheathing
8 × 20 ftplatform
Steelchassis + framing
11 stagesdocumented in photos
Direct oversightthrough the build

Documented construction

From chassis to interior close-in.

Specific materials, equipment, and sequencing can vary by configuration and written scope. These images document the original Rise20 build.

Exposed steel chassis prepared for the Rise20 tiny home build
01

Start with the steel chassis

The platform begins on its trailer chassis with the base structure exposed for inspection before floor layers close it in.

Completed light-gauge steel frame of a Rise20 on its chassis
02

Complete the structural frame

Wall, loft, and roof framing come together before the enclosure hides the connections.

Rise20 steel structure receiving exterior structural sheathing
03

Add structural sheathing

Exterior sheathing begins closing the frame while key openings remain visible.

Rise20 interior showing steel loft framing and wall structure
04

Frame the loft and interior zones

The sleeping loft and interior partitions define how the compact footprint will work.

Electrical rough-in inside the steel-framed Rise20 structure
05

Rough in the systems

Electrical pathways and connection points are routed before insulation and interior finishes.

Spray-applied foam insulation inside the Rise20 roof assembly
06

Insulate the envelope

Spray-applied foam covers the roof assembly shown in this original build.

Rise20 exterior with weather barrier and lower exterior panels installed
07

Protect and panel the exterior

Weather-resistive layers and exterior panels form the outer assembly before final openings and trim are completed.

Rise20 shell with protective exterior panel layer installed
08

Complete the exterior envelope

Protective panel layers cover the wrapped shell before the final exterior finish is applied.

Rise20 interior with fiberglass wall insulation and spray foam ceiling insulation
09

Insulate the walls and ceiling

Fiberglass batts fill the wall cavities while spray-applied foam covers the overhead assembly.

Craftspeople installing interior wall board below the Rise20 loft
10

Install the interior surfaces

The crew closes walls and builds interior partitions around the loft while keeping service points accessible.

Rise20 interior with drywall installed around the loft and windows
11

Close in the living space

Interior board covers the walls and ceiling as the compact rooms move toward final finish work.

On-site walkthrough

Step inside the build before the finishes go on.

This 20-second original walkthrough records wall insulation, the loft structure, windows, and interior board installation during the Rise20 build.

What the photographs show

Visible construction evidence.

Chassis, steel framing, loft, sheathing, rough-in work, roof and wall insulation, exterior-envelope layers, and interior close-in stages from an actual Rise20 build.

What the agreement controls

Your exact written scope.

Chosen equipment, fixtures, finishes, production schedule, delivery plan, site conditions, and final-connection responsibilities are configuration-specific.